Antunes, R, González, V A, Walsh, K, Rojas, O, O’Sullivan, M and Odeh, I (2018) Benchmarking Project-Driven Production in Construction Using Productivity Function: Capacity and Cycle Time. Journal of Construction Engineering and Management, 144(03).

Atherinis, D, Bakowski, B, Velcek, M and Moon, S (2018) Developing and Laboratory Testing a Smart System for Automated Falsework Inspection in Construction. Journal of Construction Engineering and Management, 144(03).

Castillo, T, Alarcón, L F and Salvatierra, J L (2018) Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects. Journal of Construction Engineering and Management, 144(03).

  • Type: Journal Article
  • Keywords: Management practices; Last planner system; Organization; Social networks; Key performance indicator; Project performance; Organizational issues;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001443
  • Abstract:
    Management practices of lean production within the last planner system (LPS) have enabled significant improvements in project performance worldwide. These improvements are, in part, attributed to practices that strengthen social networks within projects and enhance effective communication. However, the relationships by which LPS management practices and organizational characteristics impact project performance are not well known and require in-depth investigation. To obtain a better understanding of these relationships, analyzed data was collected from nine construction projects from two Chilean construction companies. Correlation analysis was applied to the degree of implementation of LPS practices, social networks metrics, and key performance indicators (KPIs). Significant relationships were found among these three variables. It was also found that a high implementation level of LPS practices is usually related to improved project performance, although it is not always associated with improved network metrics. The results provide insights into project performance relationships with the organization and LPS practices that should lead to improve the managerial decision-making process regarding organizational and management practices for better project performance. The role of social network properties on project performance requires further research because optimal metrics have not been established yet.

Chiang, Y, Wong, F K and Liang, S (2018) Fatal Construction Accidents in Hong Kong. Journal of Construction Engineering and Management, 144(03).

Darwish, M, Elsayed, A Y and Nassar, K (2018) Design and Constructability of a Novel Funicular Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 144(03).

Huo, T, Ren, H, Cai, W, Shen, G Q, Liu, B, Zhu, M and Wu, H (2018) Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong. Journal of Construction Engineering and Management, 144(03).

Jang, W, Yu, G, Jung, W, Kim, D and Han, S H (2018) Financial Conflict Resolution for Public-Private Partnership Projects Using a Three-Phase Game Framework. Journal of Construction Engineering and Management, 144(03).

Liao, P, Shi, H, Su, Y and Luo, X (2018) Development of Data-Driven Influence Model to Relate the Workplace Environment to Human Error. Journal of Construction Engineering and Management, 144(03).

Shrestha, P and Behzadan, A H (2018) Chaos Theory–Inspired Evolutionary Method to Refine Imperfect Sensor Data for Data-Driven Construction Simulation. Journal of Construction Engineering and Management, 144(03).

Tatum, C B ( (2018) Construction Engineering Research: Integration and Innovation. Journal of Construction Engineering and Management, 144(03).

Tatum, C B ( (2018) Learning Construction Engineering: Why, What, and How?. Journal of Construction Engineering and Management, 144(03).